Italiano   English   Contact
 
 

 

 

Research and test facilities

Behind each part MTA manufactures, there is significant research: for new materials, for new technological solutions, for new production methods. Research that continues with the extenuating quality tests that each product is subjected to, so that it reaches our customer with the certainty that it will fully satisfy the original specifications and the customer’s need.

Every product is subjected to a "qualification phase" during which a number of tests are performed:

Electrical Tests. (Measurement of the drop in power and insulation resistance; Overload, short circuit and current cycle resistance tests; Dielectric rigidity and insulation resistance tests; Micro-interruption detection)
Mechanical tests. (Tensile, rotational and extraction resistance; Impact resistance; Measurement of insertion, extraction, and mechanical seal force of the mobile and immobile parts; Vibrations and mechanical shock; Pneumatic sealing tests)

Environmental tests. (Salt spray corrosion resistance; Accelerated aging using thermal shock, temperature/humidity cycles, U.V. exposure; Overheating measurement (for powered sample); Ozone resistance; Thermal mapping with infrared thermal camera; Water and dusts resistance)

Tests on materials. (X-ray galvanic coating detection; Plastic material studies using differential scanning calorimeter and analysis of the ashes; Melt Flow Index: measurement of the fluidity of the plastic materials; Chemical compatibility with automotive fluids)

Simulation. (Thermal electric simulation of parts crossed by currents using finite element modeling software; Mechanical simulation using finite element calculation software; PROTEL SE – ICAP 4 – ANSYS MECHANICAL – ANSYS EMAG – PRO/Engineer 3D/MATCHCAD – LABVIEW

Electromagnetic Compatibility Tests
Tests on electronic components and devices compliant to Directive 2004/104 CE
Conducted disturbance emissions measuring according to CISPR25 
Electrical transient conduction tests along supply lines.
Tests methods for electrical disturbance from electrostatic discharge compliant to ISO10605
Immunity bulk current injection tests compliant to ISO11452-4
Electrical transient conduction along supply lines only, and electrical transient transmission by capacitive and inductive coupling via lines other than supply lines compliant to ISO 7637-1; 7637-2; 7637-3
Engine start voltage and electrical tests compliant to ISO16750-2 ; ISO16750-1; ISO16750-4



Laboratorio
Laboratorio
Controllo processo
Controllo processo
Prove
Prove 2
 
 
©2006 MTA S.p.A. - P.IVA 00828540153 Credits | Mappa del sito | Privacy |